Regularly inspect transformer equipment. In the event of any abnormal conditions, immediately shut down the equipment for maintenance and repairs, all of which should be conducted by professionals.
Transformers subjected to frequent high loads, overheating, or special circumstances require intensified inspection and maintenance.
Following maintenance, conduct a trial run to confirm the transformer's proper operation, and only put it into service once it is stable.
Rated Capacity: | 75 kVA; |
Mode: | D11-M-75 or depends; |
Primary Voltage: | 7620V, 7967V, 11547V, 13800V, 30000V, 33000V; |
Secondary voltage: | 220V, 240V, 440V,or depends; |
Insulation Material: | 25# 45# Mineral Oil; |
No Loading Loss: | 190 W±10%; |
Loading Loss: | 650 W±10%; |
Phase Number: | Single Phase; |
Working temperature: | -40 ℃ to 40 ℃; |
Winding Material: | 100% Copper. |
![]()
Front Mounted
|
![]()
Side Mounted
|
![]()
Single Phase Transformer
|
![]()
Single Pole Mounted
|
Winding Workshop |
Coil Drying Area |
Oil Filling Area |
Finished Product Area |
Transformer Oven |
Casting Equipment |
Foil winding machine |
Wooden Box |
Steel Structure |